Construction - Public > Shutdowns and Closures > Road Closure - 4th St. E Medium Voltage Upgrades , UA# INF-16-919  

Shutdowns and Closures: Road Closure - 4th St. E Medium Voltage Upgrades , UA# INF-16-919

Export Event

Title

Road Closure - 4th St. E Medium Voltage Upgrades , UA# INF-16-919 

Location

 

Start Time

5/13/2019 12:00 AM 

End Time

7/2/2019 11:59 PM 

Description

A road closure of 4th St. E is being planned in order to convert existing overhead power lines to underground.

This road closure is scheduled to start on Monday, May 13th, 2019 and last through July 31st, 2019.

This work could happen in the following two phases:

Phase 1 (In red on attached map)
• Only the west bound lane of 4th St. E between 2nd Ave. and Bryce Lawn Dr. will be closed
• 5/13/19 through 7/31/19

Phase 2 (In orange on attached map)
• This phase will close both westbound and eastbound lanes of 4th St. E between 2nd Ave. and Fraternity Ln.
• Bryce Lawn Dr. will also be closed from 4th St. E headed north to the first Bryce Lawn Apt. parking lot entrance
• The Pi Kappa Alpha fraternity lot will be accessible from the east bound lane of 4th St. E.
• Starting date is TBD but this phase will last through 7/31/19

All Day Event

Yes 

Recurrence

 

Workspace

Attachments
4th St E Medium Voltage Upgrades - 4th St. E Closure , 5-13-19 through 7-31-19 - Final.jpg    
Created at 5/13/2019 1:55 PM  by Alison Ferrer 
Last modified at 7/10/2019 4:46 PM  by Alison Ferrer