Skip to main content

Construction - Public

Go Search
Construction - Public
New Construction Administration
New CA Project Management Office
Active Projects
* Universal Project Documents
  
Construction - Public > Design Guidelines  

Design Guidelines

Modify settings and columns
  
View: 
descriptionFilter
Expand/Collapse Category0_Table of Contents ‎(1)
Table of Contents.pdf
Table of ContentsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)10/26/2018 3:53 PMDavid Cordingly
Expand/Collapse CategoryPreface ‎(1)
Preface.pdf
PrefaceUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:11 AMDavid Cordingly
Expand/Collapse CategorySection I: General Information ‎(12)
1) Architectural Heritage, Character and Design.pdf01
1) Architectural Heritage, Character and DesignUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
2) Owner's Responsibilities.pdf02
2) Owner's ResponsibilitiesUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
3) Designer's Responsibilities.pdf03
3) Designer's ResponsibilitiesUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
4) Instructions to Designers.pdf04
4) Instructions to DesignersUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
5) Design Deliverables.pdf05
5) Design DeliverablesUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
6) Sustainable Building.pdf06
6) Sustainable BuildingUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
7) Codes and Standards.pdf07
7) Codes and StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
8) CAD and BIM Requirements.pdf08
8) CAD and BIM RequirementsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:02 AMDavid Cordingly
9) Room and Door Numbering System.pdf09
9) Room and Door Numbering SystemUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:01 AMDavid Cordingly
10) File and Folder Naming Conventions.pdf10
10) File and Folder Naming ConventionsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 1:25 PMDavid Cordingly
11) CPTED Manual.pdf11
11) CPTED ManualUse SHIFT+ENTER to open the menu (new window).
Crime Prevention Through Environmental Design
Finished (Latest)3/5/2018 1:17 PMDavid Cordingly
12) Pedestrian System Plan.pdf12
12) Pedestrian System PlanUse SHIFT+ENTER to open the menu (new window).
The University of Alabama Pedestrian System Plan
Finished (Latest)3/5/2018 1:17 PMDavid Cordingly
Expand/Collapse CategorySection II: Standards for Specific Categories of Work ‎(18)
1) Custodial and Maintenance Standards.pdf01
1) Custodial and Maintenance StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 3:32 PMDavid Cordingly
2) Interior Architecture, Materials and Finishes.pdf02
2) Interior Architecture, Materials and FinishesUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/19/2018 11:06 AMDavid Cordingly
3) Laboratory Standards.pdf03
3) Laboratory StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/19/2018 11:47 AMDavid Cordingly
4) Fence Standards.pdf04
4) Fence StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:57 AMDavid Cordingly
5) Signage.pdf05
5) SignageUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 8:57 AMDavid Cordingly
6) Mechanical Equipment Rooms.pdf06
6) Mechanical Equipment RoomsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 9:08 AMDavid Cordingly
7) OIT - Voice and Data Telecommunications.pdf07
7) OIT - Voice and Data TelecommunicationsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 3:12 PMDavid Cordingly
8) Access Control.pdf08
8) Access ControlUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 9:11 AMDavid Cordingly
9) Public Safety.pdf09
9) Public SafetyUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 9:15 AMDavid Cordingly
10) Bollard Standards.pdf10
10) Bollard StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 10:21 AMDavid Cordingly
11) Exterior Shutter Standards.pdf11
11) Exterior Shutter StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 10:24 AMDavid Cordingly
12) Restroom and Wet Facilities Standards.pdf12
12) Restroom and Wet Facilities StandardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/19/2018 11:44 AMDavid Cordingly
13) Dumpster Enclosure.pdf13
13) Dumpster EnclosureUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 11:13 AMDavid Cordingly
14) Awnings.pdf14
14) AwningsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 11:16 AMDavid Cordingly
15) Bus Shelters and Bike Shelters.pdf15
15) Bus Shelters and Bike SheltersUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 11:20 AMDavid Cordingly
16) Small Food Venue Requirements.pdf16
16) Small Food Venue RequirementsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 11:22 AMDavid Cordingly
17) Fire Sprinkler Flow Test Requirements.pdf17
17) Fire Sprinkler Flow Test RequirementsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/5/2018 11:24 AMDavid Cordingly
18) Nursing Mothers' Room Requirements.pdf18
18) Nursing Mothers' Room RequirementsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)10/26/2018 3:54 PMDavid Cordingly
Expand/Collapse CategorySection III: Standards by CSI Divisions ‎(63)
00 00 00 - UA Required Submittals for Review.pdf00 00 00
00 00 00 - UA Required Submittals for ReviewUse SHIFT+ENTER to open the menu (new window).
UA Submittal Log
Finished (Latest)6/13/2019 9:18 AMDavid Cordingly
01 21 00 - Allowances Generic Specification.docx01 21 00
01 21 00 - Allowances Generic SpecificationUse SHIFT+ENTER to open the menu (new window).
UA Allowances Project Manual Specification
Finished (Latest)4/18/2018 11:06 AMDavid Cordingly
01 22 00 - Unit Prices Generic Specification.docx01 22 00
01 22 00 - Unit Prices Generic SpecificationUse SHIFT+ENTER to open the menu (new window).
UA Unit Prices Project Manual Specification
Finished (Latest)4/18/2018 11:06 AMDavid Cordingly
01 23 00 - Alternates Generic Specification.docx01 23 00
01 23 00 - Alternates Generic SpecificationUse SHIFT+ENTER to open the menu (new window).
UA Alternates Project Manual Specification
Finished (Latest)4/18/2018 11:06 AMDavid Cordingly
01 32 00 - Construction Progress Documentation.pdf01 32 00
01 32 00 - Construction Progress DocumentationUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)6/13/2019 9:17 AMDavid Cordingly
01 33 00 - Submittal Procedures.pdf01 33 00
01 33 00 - Submittal ProceduresUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:27 AMDavid Cordingly
01 40 00 - Quality Requirements.pdf01 40 00
01 40 00 - Quality RequirementsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:27 AMDavid Cordingly
01 50 00 - Temporary Facilities.pdf01 50 00
01 50 00 - Temporary FacilitiesUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:27 AMDavid Cordingly
01 51 13 - Temporary Electricity.pdf01 51 13
01 51 13 - Temporary ElectricityUse SHIFT+ENTER to open the menu (new window).
Temporary Electricity Design for all projects at The University of Alabama
Finished (Latest)3/19/2018 4:31 PMDavid Cordingly
01 56 39 - Temporary Tree and Plant Protection.pdf01 56 39
01 56 39 - Temporary Tree and Plant ProtectionUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:42 AMDavid Cordingly
01 60 00 - Materials and Product Requirements.pdf01 60 00
01 60 00 - Materials and Product RequirementsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:42 AMDavid Cordingly
01 70 00 - Execution and Closeout Requirements.pdf01 70 00
01 70 00 - Execution and Closeout RequirementsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:43 AMDavid Cordingly
01 78 00 - Closeout Submittal and Project Record Documents.pdf01 78 00
01 78 00 - Closeout Submittal and Project Record DocumentsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:43 AMDavid Cordingly
02 21 00 - Assessments and Surveys.pdf02 21 00
02 21 00 - Assessments and SurveysUse SHIFT+ENTER to open the menu (new window).
Site Survey Assessment and the Investigation of Subsurface and other Geotechnical Conditions
Finished (Latest)9/19/2017 2:20 PMDavid Cordingly
02 21 00 - Existing Conditions.pdf02 21 00
02 21 00 - Existing ConditionsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:27 AMDavid Cordingly
02060 Building Demolition.pdf02060
02060 Building DemolitionUse SHIFT+ENTER to open the menu (new window).
Under Construction9/19/2017 9:33 AMDavid Cordingly
02231 Tree Treatment and Preservation.pdf02231
02231 Tree Treatment and PreservationUse SHIFT+ENTER to open the menu (new window).
Under Construction9/19/2017 9:33 AMDavid Cordingly
02239-Storm Water Permit and Monitoring.pdf02239
02239-Storm Water Permit and MonitoringUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:21 AMAndrew Beeson
02242-Demolition, Clearing and Grubbing.pdf02242
02242-Demolition, Clearing and GrubbingUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02246-Roadway and Parking Lot Construction.pdf02246
02246-Roadway and Parking Lot ConstructionUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02249-Trenching,Backfill and Compaction.pdf02249
02249-Trenching,Backfill and CompactionUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02433-Storm Sewer.pdf02433
02433-Storm SewerUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02500-Asphalt Paving.pdf02500
02500-Asphalt PavingUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02620-Existing Utilities.pdf02620
02620-Existing UtilitiesUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02800-Traffic Control.pdf02800
02800-Traffic ControlUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02810-Irrigation.pdf02810
02810-IrrigationUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02870-Landscape Furnishings.pdf02870
02870-Landscape FurnishingsUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02900-Landscaping and Topsoil.pdf02900
02900-Landscaping and TopsoilUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02911-Traffic Striping, Markings and Legends.pdf02911
02911-Traffic Striping, Markings and LegendsUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
02920-Lawns and Grasses.pdf02920
02920-Lawns and GrassesUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:20 AMAndrew Beeson
03 00 00 - Concrete.pdf03 00 00
03 00 00 - ConcreteUse SHIFT+ENTER to open the menu (new window).
General Concrete Use, Curing, Forming, Reinforcing, Finishing and Concrete Accessories
Finished (Latest)3/19/2018 4:32 PMDavid Cordingly
04 00 00 - Masonry.pdf04 00 00
04 00 00 - MasonryUse SHIFT+ENTER to open the menu (new window).
Masonry Maintenance, Mortaring, Unit Masonry, Anchoring, and Stone Assemblies
Under Construction3/19/2018 4:32 PMDavid Cordingly
05 00 00 - Metals.pdf05 00 00
05 00 00 - MetalsUse SHIFT+ENTER to open the menu (new window).
Structural Steel Framing, Downspout Boots & Metal Cast, Exterior Handrails, and Bollards
Finished (Latest)3/19/2018 4:32 PMDavid Cordingly
06 00 00 - Wood, Plastics, and Composites.pdf06 00 00
06 00 00 - Wood, Plastics, and CompositesUse SHIFT+ENTER to open the menu (new window).
Maintenance of Various Wood, Plastics, and Composites, Rough Carpentry Practices, Millwork, and Architectural Woodwork
Finished (Latest)3/19/2018 4:32 PMDavid Cordingly
07 20 00 - Thermal Insulation.pdf07 20 00
07 20 00 - Thermal InsulationUse SHIFT+ENTER to open the menu (new window).
General Thermal and Moisture Protection Guidelines
Finished (Latest)3/19/2018 4:32 PMDavid Cordingly
07 25 00 - Weather Barriers and Flashings.pdf07 25 00
07 25 00 - Weather Barriers and FlashingsUse SHIFT+ENTER to open the menu (new window).
Standards for air barriers and flashings for buildings with conditioned spaces.
Finished (Latest)10/10/2018 4:52 PMBryan T. Wood
07 30 00 - Steep Slope Roofing.pdf07 30 00
07 30 00 - Steep Slope RoofingUse SHIFT+ENTER to open the menu (new window).
Finished Roofing Materials (Synthetic Slate, Architectural Shingles, & Standing and Flat Seam Metal) & Accompanying Materials
Finished (Latest)10/10/2018 4:51 PMBryan T. Wood
07 90 00 - Joint Protection and Sealants.pdf07 90 00
07 90 00 - Joint Protection and SealantsUse SHIFT+ENTER to open the menu (new window).
Exterior Joint Sealants Guidelines
Finished (Latest)3/19/2018 4:32 PMDavid Cordingly
08 10 00 - Doors and Frames.pdf08 10 00
08 10 00 - Doors and FramesUse SHIFT+ENTER to open the menu (new window).
Wood & Hollow Metal Doors and Hollow Metal Steel Door Frames
Finished (Latest)10/6/2017 4:12 PMDavid Cordingly
08 40 00 - Entrances, Storefronts, and Curtain Walls.pdf08 40 00
08 40 00 - Entrances, Storefronts, and Curtain WallsUse SHIFT+ENTER to open the menu (new window).
Curtain Wall and Storefront Assembly Guidelines
Finished (Latest)10/6/2017 4:12 PMDavid Cordingly
08 50 00 - Windows.pdf08 50 00
08 50 00 - WindowsUse SHIFT+ENTER to open the menu (new window).
Guidelines for Windows on New and Existing Buildings, Glazing, Panning, and Flashing Requirements
Finished (Latest)10/6/2017 4:00 PMDavid Cordingly
08 71 00 - Doors Hardware.pdf08 71 00
08 71 00 - Doors HardwareUse SHIFT+ENTER to open the menu (new window).
Door Hardware Scheduling, Installation and Accessories
Finished (Latest)10/6/2017 4:12 PMDavid Cordingly
08 90 00 - Louvers and Vents.pdf08 90 00
08 90 00 - Louvers and VentsUse SHIFT+ENTER to open the menu (new window).
Metal Wall Louvers, Dampers, Shutters and Louver Accessories
Finished (Latest)10/6/2017 4:12 PMDavid Cordingly
09 00 00 - Finishes.pdf09 00 00
09 00 00 - FinishesUse SHIFT+ENTER to open the menu (new window).
Interior finishes, gypsum board, tiling, ceiling material and treatment, flooring, and wall finishes.
Finished (Latest)3/19/2018 11:35 AMDavid Cordingly
09 90 00 - Painting and Coating.pdf09 90 00
09 90 00 - Painting and CoatingUse SHIFT+ENTER to open the menu (new window).
Interior and Exterior Painting, Staining and Finishing, High-Performance Coatings
Finished (Latest)2/23/2018 2:56 PMDavid Cordingly
10 00 00 - Specialties.pdf10 00 00
10 00 00 - SpecialtiesUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:43 AMDavid Cordingly
11 00 00 - Equipment.pdf11 00 00
11 00 00 - EquipmentUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:43 AMDavid Cordingly
12 00 00 - Furnishings.pdf12 00 00
12 00 00 - FurnishingsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:45 AMDavid Cordingly
14 00 00 - Conveying Equipment.pdf14 00 00
14 00 00 - Conveying EquipmentUse SHIFT+ENTER to open the menu (new window).
Electric Traction & Hydraulic Elevators, Lifts and Facility Trash Chutes
Finished (Latest)8/3/2018 2:32 PMDavid Cordingly
21 00 00 - Fire Suppression.pdf21 00 00
21 00 00 - Fire SuppressionUse SHIFT+ENTER to open the menu (new window).
Fire-Suppression Systems, Fire Hydrants, FDC's, and Fire Sprinkler Systems
Finished (Latest)3/19/2018 4:35 PMDavid Cordingly
23 00 00 - Heating, Ventilating, and Air Conditioning.pdf23 00 00
23 00 00 - Heating, Ventilating, and Air ConditioningUse SHIFT+ENTER to open the menu (new window).
Guidelines for the operation & maintenance for HVAC systems, common work results, HVAC commissioning, piping, pumps, and other HVAC equipment. 
Finished (Latest)2/21/2019 11:16 AMDavid Cordingly
26 00 00 - Electrical.pdf26 00 00
26 00 00 - ElectricalUse SHIFT+ENTER to open the menu (new window).
Guidelines for the operation & maintenance of electrical systems, common work
results, commissioning, medium-voltage & low-voltage distribution, and lighting.
Finished (Latest)4/23/2019 4:54 PMDavid Cordingly
27 00 00 - OIT and Telecommunications.pdf27 00 00
27 00 00 - OIT and TelecommunicationsUse SHIFT+ENTER to open the menu (new window).
Section includes various guidelines for the operation and maintenance of communication systems, common work results, structured cabling, data communications, and audio-video communications.
Finished (Latest)1/2/2019 1:37 PMDavid Cordingly
27 32 50 - Communications System for Area of Rescue Assistance.pdf27 32 50
27 32 50 - Communications System for Area of Rescue AssistanceUse SHIFT+ENTER to open the menu (new window).
Under Construction2/26/2015 8:34 AMDavid Cordingly
27 53 13 - Clock System.pdf27 53 13
27 53 13 - Clock SystemUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)6/3/2016 8:18 AMDavid Cordingly
28 00 00 - Electronic Safety and Security.pdf28 00 00
28 00 00 - Electronic Safety and SecurityUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)1/2/2019 1:36 PMDavid Cordingly
28 46 00 - Fire Detection and Alarm.pdf28 46 00
28 46 00 - Fire Detection and AlarmUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)4/18/2018 10:57 AMDavid Cordingly
31 00 00 - Earthwork.pdf31 00 00
31 00 00 - EarthworkUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:52 AMDavid Cordingly
31 20 00 - Subgrade Processing and Topsoil Replacement.pdf31 20 00
31 20 00 - Subgrade Processing and Topsoil ReplacementUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)9/19/2017 11:10 AMDavid Cordingly
31 31 16 - Termite Control.pdf31 31 16
31 31 16 - Termite ControlUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)9/19/2017 9:53 AMDavid Cordingly
33 00 00 - Utilities.pdf33 00 00
33 00 00 - UtilitiesUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:56 AMDavid Cordingly
40 00 00 - Process Interconnections.pdf40 00 00
40 00 00 - Process InterconnectionsUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:56 AMDavid Cordingly
42 00 00 - Process Heating, Cooling, and Drying Equipment.pdf42 00 00
42 00 00 - Process Heating, Cooling, and Drying EquipmentUse SHIFT+ENTER to open the menu (new window).
Under Construction3/20/2018 10:57 AMDavid Cordingly
Expand/Collapse CategorySection IV: Standard Drawings ‎(47)
Joist Reinforcement Detail.pdf
Joist Reinforcement DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)7/17/2014 8:20 AMDavid Cordingly
Earthwork - Subgrade and Topsoil Grading Requirements.pdf
Earthwork - Subgrade and Topsoil Grading RequirementsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)12/17/2015 10:09 AMDavid Cordingly
Interior Signage.pdf00
Interior SignageUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:23 AMAndrew Beeson
Project Signage - Non State Funded with Rendering.pdf00A
Project Signage - Non State Funded with RenderingUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)6/20/2017 4:29 PMDavid Cordingly
Project Signage - State Funded.pdf00B
Project Signage - State FundedUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)6/20/2017 4:29 PMDavid Cordingly
Bus Shelter and Bike Shelter.pdf01
Bus Shelter and Bike ShelterUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:24 AMAndrew Beeson
Typical Single Dumpster Enclosure.pdf01
Typical Single Dumpster EnclosureUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)7/16/2019 9:37 AMDavid Cordingly
Pedestrian Bollard.pdf01A
Pedestrian BollardUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)7/25/2016 10:14 AMDavid Cordingly
Traffic Bollard.pdf01A
Traffic BollardUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)7/25/2016 10:14 AMDavid Cordingly
Handicap Sign with Bollard Detail.pdf01A
Handicap Sign with Bollard DetailUse SHIFT+ENTER to open the menu (new window).
Under Construction7/25/2016 10:13 AMDavid Cordingly
Decorative Fencing Details.pdf01F
Decorative Fencing DetailsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)7/13/2017 11:46 AMDavid Cordingly
Handrail Anchor in Cored Hole.pdf01H
Handrail Anchor in Cored HoleUse SHIFT+ENTER to open the menu (new window).
Uploaded per D. Cordingly
Finished (Latest)7/25/2013 10:05 AMCarrie Pope
Downspout Boot Detail.pdf01H
Downspout Boot DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)2/28/2018 3:12 PMDavid Cordingly
Decorative Exterior Handrail.pdf01H
Decorative Exterior HandrailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)2/27/2018 4:59 PMDavid Cordingly
Storm Structure Junction Box.pdf02
Storm Structure Junction BoxUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
Precast Manhole Section.pdf02
Precast Manhole SectionUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
Precast Eccentric Cone Manhole Section.pdf02
Precast Eccentric Cone Manhole SectionUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
SST-2 Anchoring Technique for Haybales.pdf02
SST-2 Anchoring Technique for HaybalesUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
BIP-1 Block and Gravel Inlet Protection.pdf02
BIP-1 Block and Gravel Inlet ProtectionUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
SB-4 Silt Fence Installation.pdf02
SB-4 Silt Fence InstallationUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
SB-1 Silt Fence Type A.pdf02
SB-1 Silt Fence Type AUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
SST-1 Placement of Straw Bale.pdf02
SST-1 Placement of Straw BaleUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
Standard Utility Trench Details.pdf02
Standard Utility Trench DetailsUse SHIFT+ENTER to open the menu (new window).
Under Construction10/18/2016 8:47 AMDavid Cordingly
Storm Sewer Trench Details.pdf02
Storm Sewer Trench DetailsUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
Sanitary Sewer Trench Details.pdf02
Sanitary Sewer Trench DetailsUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:27 AMAndrew Beeson
Water Main Trench Details PVC or Ductibe Iron.pdf02
Water Main Trench Details PVC or Ductibe IronUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:28 AMAndrew Beeson
Truncated Domes.pdf02
Truncated DomesUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:28 AMAndrew Beeson
Construction Fence Detail.pdf02
Construction Fence DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)2/8/2018 10:35 AMDavid Cordingly
Silt Fence Detail.pdf02
Silt Fence DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)2/8/2018 10:36 AMDavid Cordingly
Bench Pads.pdf02B
Bench PadsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:28 AMAndrew Beeson
Trash Receptacle Pads.pdf02B
Trash Receptacle PadsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:29 AMAndrew Beeson
Typical Bike Rack Layout.pdf02B
Typical Bike Rack LayoutUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)4/5/2018 9:26 AMDavid Cordingly
Sidewalk and Crosswalk.pdf02S
Sidewalk and CrosswalkUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:29 AMAndrew Beeson
Integral Sidewalk and Curb Detail.pdf02S
Integral Sidewalk and Curb DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:29 AMAndrew Beeson
Typical Brick Paver Walk.pdf02S
Typical Brick Paver WalkUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:30 AMAndrew Beeson
Flashing Details.pdf04
Flashing DetailsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:30 AMAndrew Beeson
Brick Wall Mockup Detail.pdf04
Brick Wall Mockup DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:30 AMAndrew Beeson
Double Sealant Section.pdf07
Double Sealant SectionUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:33 AMAndrew Beeson
Toilet Tissue Dispenser Layout.pdf09
Toilet Tissue Dispenser LayoutUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:33 AMAndrew Beeson
Junction Box Detail.pdf16
Junction Box DetailUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:22 AMAndrew Beeson
Exterior Area Lighting.pdf16
Exterior Area LightingUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:22 AMAndrew Beeson
Security Booth Details.pdf16
Security Booth DetailsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:22 AMAndrew Beeson
Access Control Cut Sheets May 2012.pdf16
Access Control Cut Sheets May 2012Use SHIFT+ENTER to open the menu (new window).
Finished (Latest)6/1/2012 2:29 PMCarolyn Hyde
Access Control Door Riser Diagrams - June 2015.pdf16
Access Control Door Riser Diagrams - June 2015Use SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/17/2017 8:22 AMDavid Cordingly
Data Room Typical Wall Elevation.pdf16
Data Room Typical Wall ElevationUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/30/2018 2:13 PMDavid Cordingly
Data Room Layout.pdf16
Data Room LayoutUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/30/2018 2:14 PMDavid Cordingly
Blue Emergency Phone Installation Detail.pdf17
Blue Emergency Phone Installation DetailUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)8/25/2017 2:46 PMDavid Cordingly
Expand/Collapse CategorySection VI: Installation Photographs ‎(43)
Toilet Tissue Dispenser Location.pdf01
Toilet Tissue Dispenser LocationUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:24 AMAndrew Beeson
Walk Off Mat in Vestibule.pdf01
Walk Off Mat in VestibuleUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:24 AMAndrew Beeson
Preferred Corner Condition.pdf01
Preferred Corner ConditionUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:24 AMAndrew Beeson
Dumpster Enclosure.pdf01
Dumpster EnclosureUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:24 AMAndrew Beeson
Security Booth.pdf01
Security BoothUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:25 AMAndrew Beeson
Decorative Fencing.pdf01
Decorative FencingUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:25 AMAndrew Beeson
Decorative Railing.pdf01
Decorative RailingUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:25 AMAndrew Beeson
Full Glass Doors with Panic Hardware.pdf01
Full Glass Doors with Panic HardwareUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:25 AMAndrew Beeson
Brick Wall.pdf01
Brick WallUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:25 AMAndrew Beeson
Bollards.pdf01
BollardsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:25 AMAndrew Beeson
Silt Fence.pdf02
Silt FenceUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:28 AMAndrew Beeson
Integral Sidewalk and Curb.pdf02
Integral Sidewalk and CurbUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:28 AMAndrew Beeson
Landscape Furnishings.pdf02L
Landscape FurnishingsUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:29 AMAndrew Beeson
Landscaping, Site Furnishings and Walks.pdf02L
Landscaping, Site Furnishings and WalksUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:29 AMAndrew Beeson
Brick Wall Mockup.pdf04
Brick Wall MockupUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:31 AMAndrew Beeson
Downspout Boots Photo.pdf05
Downspout Boots PhotoUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)3/21/2016 4:37 PMDavid Cordingly
Standard Lay-in Ceiling.pdf09
Standard Lay-in CeilingUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:33 AMAndrew Beeson
Blue Phones.pdf16
Blue PhonesUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)8/17/2017 11:53 AMDavid Cordingly
Light Pole and Base.pdf16
Light Pole and BaseUse SHIFT+ENTER to open the menu (new window).
Finished (Latest)5/10/2012 10:23 AMAndrew Beeson
Concealed EPT.pdfDO #01
Concealed EPTUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:17 AMAndrew Beeson
Cane Detection below Stair Landing.pdfDO #02
Cane Detection below Stair LandingUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Mirror Support Location.pdfDO #05
Mirror Support LocationUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Drywall Joint Centered on Door Frame.pdfDO #06
Drywall Joint Centered on Door FrameUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Caulk Joint Application.pdfDO #07
Caulk Joint ApplicationUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Pipe Enclosure below Vanity.pdfDO #08
Pipe Enclosure below VanityUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:37 AMAndrew Beeson
Electric Water Cooler Installation.pdfDO #09
Electric Water Cooler InstallationUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Paper Towel and Liquid Soap.pdfDO #11
Paper Towel and Liquid SoapUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Fire Extinguisher Cabinet.pdfDO #12
Fire Extinguisher CabinetUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
View Window.pdfDO #14
View WindowUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Preferred Wall Window Interface.pdfDO #15
Preferred Wall Window InterfaceUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:16 AMAndrew Beeson
Tegular Ceiling Tile.pdfDO #16
Tegular Ceiling TileUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Preferred Ceramic Tile Carpet Interface.pdfDO #19
Preferred Ceramic Tile Carpet InterfaceUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Properly Installed Floor Sink Drain.pdfDO #20
Properly Installed Floor Sink DrainUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Floor Drain with Proper Slope and Coordinated with Tile Pattern.pdfDO #21
Floor Drain with Proper Slope and Coordinated with Tile PatternUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Proper Loading Dock Threshold.pdfDO #22
Proper Loading Dock ThresholdUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Suspension Wire.pdfDONT #1
Suspension WireUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Precast Joint.pdfDONT #3
Precast JointUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Drywall Bulkhead.pdfDONT #4
Drywall BulkheadUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Flashmark.pdfDONT #5
FlashmarkUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
EPT.pdfDONT #6
EPTUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Finish of Stair Stringer.pdfDONT #7
Finish of Stair StringerUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Improper Cleanout.pdfDONT #8
Improper CleanoutUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson
Improper Loading Dock Threshold.pdfDONT #9
Improper Loading Dock ThresholdUse SHIFT+ENTER to open the menu (new window).
Under Construction5/10/2012 10:15 AMAndrew Beeson